|
Chemin de fer Aigle-Ollon-Monthey-Champéry 
Aigle, Vaud - Switzerland (ch)
| line
|
| open: |
1899-06-22 |
| closed: |
|
| status: |
open |
| type: |
cog wheel railway |
| track: |
strub |
| numbers of stations: |
|
| bottom station: |
Aigle CFF (404 m) |
| top station: |
Champéry (1035 m) |
| gauage (mm): |
1000 |
| length (m): |
23 138 |
| diff of levels (m): |
645 |
| gradient: |
13,5% |
| energy |
| driving: |
electric |
| power: |
|
| cable: |
|
| speed (m/s): |
30 km/h |
| time of ride: |
|
| car |
| numbers of cars: |
|
| length (m): |
|
| width (m): |
|
| height (m): |
|
| weight (kg): |
|
| load (kg): |
|
| passenger: |
|
| seating: |
|
| standing: |
|
| capacity (pers/h): |
|
| misc |
| delivery number: |
|
| Builder: |
|
| Operator: |
Chemin de fer Aigle-Ollon-Monthey-Champéry |
ETE#:  |
|
|
1899-06-22 -- 1907-04-03: steam
zahnstage 3,66 km
950 V= Pantograf
Route 1: Aigle CFF-Ollon-Monthey-Ville-Champéry
Route 2: Monthey-Monthey CFF
Källor: 2)
|