Bruse's Funiculars.net
start
  articles - gallery - database - faq - links - info  
 english

Mount Carmel Railway il
Haifa - Israel (il)

line
open: 1959 
closed:  
status: open 
type: funicular 
track: normal 
numbers of stations:
bottom station: Paris Square (0 m) 
top station: Gan Ha'em (267 m) 
gauage (mm): 1400 
length (m): 1780 
diff of levels (m): 267 
gradient: 30% 
energy
driving: electric 
power: 2 x 700 kW 
cable: 57 mm + 35 mm 
speed (m/s):
time of ride: 6-7 min 
car
numbers of cars: 2+2 
length (m):  
width (m):  
height (m):  
weight (kg):  
load (kg):  
passenger: 400 
seating:  
standing:  
capacity (pers/h):  
misc
delivery number:  
Builder: von Roll, Gangloff, Frey 
Operator: The Carmelit Haifa Ldt. 
ETE#:  


Haifa Israel (metroPlanet)

line in tunnel; 4 intermediate stas.; 2 car trains in operation
reopened 1992
Källor: Daube .A, Carmelit Haifa Ltd (funiculr@netvision.net.il)


 

tram.se email Copyright © 1998-2024 Pantograph.se® - Bruse LF Persson. Alla rättigheter förbehållna. All rights reserved. Alle Rechte vorbehalten. Tous droits réservés.