Bruse's Funiculars.net
start
  articles - gallery - database - faq - links - info  
 english

Montjuich es
Barcelona - Spain (es)

line
open: 1928-10-24 
closed:  
status: open 
type: funicular 
track:  
numbers of stations:
bottom station: Paral-lel 
top station: Parc de Montjuich 
gauage (mm):  
length (m): 758 
diff of levels (m): 102 
gradient: 3% - 18% 
energy
driving: electric 
power:  
cable:  
speed (m/s): 10 
time of ride: 2 min 
car
numbers of cars:
length (m):  
width (m):  
height (m):  
weight (kg):  
load (kg):  
passenger: 400 
seating:  
standing:  
capacity (pers/h):  
misc
delivery number:  
Builder:  
Operator: www TMB 
ETE#:  

Montjuich


Montjuïc funicular railway

two connected segments; electric


 

tram.se email Copyright © 1998-2025 Pantograph.se® - Bruse LF Persson. Alla rättigheter förbehållna. All rights reserved. Alle Rechte vorbehalten. Tous droits réservés.