Moléson sur Gruyères 
Moléson-Sur-Gruyères, Friburg - Switzerland (ch)
Photo: © Doppelmayr Seilbahnen (published with permission)
line
|
open: |
1998 |
closed: |
|
status: |
open |
type: |
funicular |
track: |
normal |
numbers of stations: |
|
bottom station: |
Moléson Village (1109,5 m) |
top station: |
Plan Francey (1520,5 m) |
gauage (mm): |
1200 |
length (m): |
1364 |
diff of levels (m): |
411 |
gradient: |
51,8% |
energy |
driving: |
electric |
power: |
|
cable: |
|
speed (m/s): |
10 |
time of ride: |
|
car |
numbers of cars: |
|
length (m): |
|
width (m): |
|
height (m): |
|
weight (kg): |
|
load (kg): |
|
passenger: |
|
seating: |
|
standing: |
|
capacity (pers/h): |
|
misc |
delivery number: |
|
Builder: |
Doppelmayr |
Operator: |
Gruyères-Moléson-Vudalla SA |
ETE#:  |
|
|
|