Bruse's Funiculars.net
start
  articles - gallery - database - faq - links - info  
 english

Gelida es
Barcelona - Spain (es)

line
open: 1924 
closed:  
status:  
type: funicular 
track:  
numbers of stations:  
bottom station: RENFE station 
top station: Gelida 
gauage (mm):  
length (m): 860 
diff of levels (m): 103 
gradient:  
energy
driving:  
power:  
cable:  
speed (m/s):  
time of ride:  
car
numbers of cars:
length (m):
width (m):
height (m):  
weight (kg):  
load (kg):  
passenger:  
seating:  
standing:  
capacity (pers/h):  
misc
delivery number:  
Builder: Santiago Rubió i Tudurí 
Operator: www Ferrocarrils de la Generalitat de Catalunya 
ETE#:  


new cars 1981 from FGC Martorel,l 8x2 meter


 

tram.se email Copyright © 1998-2025 Pantograph.se® - Bruse LF Persson. Alla rättigheter förbehållna. All rights reserved. Alle Rechte vorbehalten. Tous droits réservés.