Bruse's Funiculars.net
start
  articles - gallery - database - faq - links - info  
 english

Funiculaire du Mont-Pélerin ch
Vevey, Vaud - Switzerland (ch)

line
open: 1900-07-24 
closed:  
status: open 
type: funicular 
track:  
numbers of stations:  
bottom station: Vevey Plan (394 m) 
top station: Mont Pélerin (812 m) 
gauage (mm): 1000 
length (m): 1585 
diff of levels (m): 414 
gradient: 54% 
energy
driving: electric 
power: 125/210 kW 
cable: 36 mm 
speed (m/s):
time of ride: 12 min 
car
numbers of cars:
length (m):  
width (m):  
height (m):  
weight (kg):  
load (kg):  
passenger: 80 
seating:  
standing:  
capacity (pers/h):  
misc
delivery number:  
Builder:  
Operator: www Montreux - Berner Oberland - Bahn (MOB) 
ETE#:  


Golden Pass

3 intermediate stations existed in 1906
tunnel 118 m
ombyggd 1993
Källor: 2)


 

tram.se email Copyright © 1998-2025 Pantograph.se® - Bruse LF Persson. Alla rättigheter förbehållna. All rights reserved. Alle Rechte vorbehalten. Tous droits réservés.