|
Karaköy - Beyoglu 
Istanbul - Turkey (tr)
data
notes
Photo: © Olle S Nevenius (published with permission)
| line
|
| open: |
1875-01-18 |
| closed: |
|
| status: |
open |
| type: |
funicular |
| track: |
|
| numbers of stations: |
|
| bottom station: |
Galata (1 m) |
| top station: |
Pera (63 m) |
| gauage (mm): |
1980 |
| length (m): |
606 |
| diff of levels (m): |
62 |
| gradient: |
14,9% |
| energy |
| driving: |
electric |
| power: |
|
| cable: |
|
| speed (m/s): |
8,3 |
| time of ride: |
|
| car |
| numbers of cars: |
2 |
| length (m): |
|
| width (m): |
|
| height (m): |
|
| weight (kg): |
|
| load (kg): |
|
| passenger: |
166 |
| seating: |
|
| standing: |
|
| capacity (pers/h): |
332 |
| misc |
| delivery number: |
|
| Builder: |
|
| Operator: |
|
ETE#:  |
TR-70001 |
|
line in tunnel
reconstructed 1905, before steam
reconstructed 1970
back
|